Gear Legs

Gear leg attach point (1).

Gear leg attach point (2).

Testing finger strap position..

Cutting the ends of the tubes. I made two jigs, one for the two tubes and the other for the axle. This is the axle jig.

This is the vee tube jig.

All jigged up.

Tack welded in position.

Fitted to fuse to check fit.

Cabane strut in position.

All squared up ready for welding.

Suspension Struts ready for welding.

Suspension Struts ready for installation.

Waiting for the wheels to be delivered.

Temporary fitting of the wheels.